Solar power plant · Cameron, TX
Vancourt Solar Interconnections
Vancourt Solar Interconnections is a 45 MW solar power plant in Cameron County, Texas, operated by Rayos del Sol Solar Project, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 94 GWh, about what 7,100 average Texas homes use in a year.
Vancourt Solar Interconnections in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 166th largest, about 0.1% of the state's 37 GW of solar capacity.
Cameron County has 23 power plants of 1 MW or more with 1.6 GW in all; Vancourt Solar Interconnections is 3% of that and the 2nd largest of 2 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Vancourt Solar Interconnections (outlined) and other plants in Cameron County, shaded. 26.090, -97.798.
Plant facts
- Operator
- Rayos del Sol Solar Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Cameron County, TX
- EIA plant ID
- 65662
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| VAN1 | Solar Photovoltaic | 45 MW | 2022 | – |
Questions
Vancourt Solar Interconnections, answered
How much power does Vancourt Solar Interconnections produce?
Vancourt Solar Interconnections has 45 MW of capacity from one generator. In 2025 it generated 94 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Vancourt Solar Interconnections power?
Its 2025 output of 94 GWh equals the yearly electricity use of about 7,100 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Vancourt Solar Interconnections?
Vancourt Solar Interconnections is in Cameron County, Texas, at about 26.090°, -97.798°. It is one of 23 power plants of 1 MW or more in the county. The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Vancourt Solar Interconnections?
It is operated by Rayos del Sol Solar Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Vancourt Solar Interconnections open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.