Solar power plant · Gilchrist, FL
Bell Ridge Solar
Bell Ridge Solar is a 75 MW solar power plant in Gilchrist County, Florida, operated by Bell Ridge Solar, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 196 GWh, about what 15,000 average Florida homes use in a year.
Bell Ridge Solar in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 101st largest, about 0.5% of the state's 14 GW of solar capacity.
Gilchrist County has 4 power plants of 1 MW or more with 235 MW in all; Bell Ridge Solar is 32% of that and the 3rd largest of 3 solar plants there.
Its capacity factor of 30% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Gilchrist County goes 19 hours a year without power, the 16th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Bell Ridge Solar (outlined) and other plants in Gilchrist County, shaded. 29.719, -82.711.
Plant facts
- Operator
- Bell Ridge Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SEC
- County
- Gilchrist County, FL
- EIA plant ID
- 65519
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BRS | Solar Photovoltaic | 75 MW | 2023 | – |
Nearby
Other plants in Gilchrist County
Questions
Bell Ridge Solar, answered
How much power does Bell Ridge Solar produce?
Bell Ridge Solar has 75 MW of capacity from one generator. In 2025 it generated 196 GWh, 30% of the most it could have made running flat out all year (its capacity factor).
How many homes does Bell Ridge Solar power?
Its 2025 output of 196 GWh equals the yearly electricity use of about 15,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Bell Ridge Solar?
Bell Ridge Solar is in Gilchrist County, Florida, at about 29.719°, -82.711°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Gilchrist County goes 19 hours a year without power, the 16th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Bell Ridge Solar?
It is operated by Bell Ridge Solar, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority SEC.
When did Bell Ridge Solar open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.