Solar power plant · Gilchrist, FL
County Line Renewable Energy Center
County Line Renewable Energy Center is a 75 MW solar power plant in Gilchrist County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 187 GWh, about what 14,000 average Florida homes use in a year.
County Line Renewable Energy Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 33rd largest, about 0.5% of the state's 14 GW of solar capacity.
Gilchrist County has 4 power plants of 1 MW or more with 235 MW in all; County Line Renewable Energy Center is 32% of that and the 2nd largest of 3 solar plants there.
Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Gilchrist County goes 19 hours a year without power, the 16th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
County Line Renewable Energy Center (outlined) and other plants in Gilchrist County, shaded. 29.812, -82.676.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Gilchrist County, FL
- EIA plant ID
- 67049
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 75 MW | 2024 | – |
Nearby
Other plants in Gilchrist County
Questions
County Line Renewable Energy Center, answered
How much power does County Line Renewable Energy Center produce?
County Line Renewable Energy Center has 75 MW of capacity from one generator. In 2025 it generated 187 GWh, 28% of the most it could have made running flat out all year (its capacity factor).
How many homes does County Line Renewable Energy Center power?
Its 2025 output of 187 GWh equals the yearly electricity use of about 14,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is County Line Renewable Energy Center?
County Line Renewable Energy Center is in Gilchrist County, Florida, at about 29.812°, -82.676°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Gilchrist County goes 19 hours a year without power, the 16th most of 67 counties in Florida. The county's page has the full outage record.
Who operates County Line Renewable Energy Center?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did County Line Renewable Energy Center open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.