Solar power plant · Gilchrist, FL
Trenton Solar Power Plant
Trenton Solar Power Plant is a 75 MW solar power plant in Gilchrist County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2019. In 2025 it generated 174 GWh, about what 13,000 average Florida homes use in a year.
Trenton Solar Power Plant in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 17th largest, about 0.5% of the state's 14 GW of solar capacity.
Gilchrist County has 4 power plants of 1 MW or more with 235 MW in all; Trenton Solar Power Plant is 32% of that and the largest of 3 solar plants there.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Gilchrist County goes 19 hours a year without power, the 16th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Trenton Solar Power Plant (outlined) and other plants in Gilchrist County, shaded. 29.635, -82.843.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Gilchrist County, FL
- EIA plant ID
- 62543
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 75 MW | 2019 | – |
Nearby
Other plants in Gilchrist County
Questions
Trenton Solar Power Plant, answered
How much power does Trenton Solar Power Plant produce?
Trenton Solar Power Plant has 75 MW of capacity from one generator. In 2025 it generated 174 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Trenton Solar Power Plant power?
Its 2025 output of 174 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Trenton Solar Power Plant?
Trenton Solar Power Plant is in Gilchrist County, Florida, at about 29.635°, -82.843°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Gilchrist County goes 19 hours a year without power, the 16th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Trenton Solar Power Plant?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did Trenton Solar Power Plant open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.