Solar power plant · Calhoun, FL

Big Brook

Big Brook is a 75 MW solar power plant in Calhoun County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2026.

Capacity75 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Big Brook in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 160th largest, about 0.5% of the state's 14 GW of solar capacity.

Calhoun County has 7 power plants of 1 MW or more with 820 MW in all; Big Brook is 9% of that and the 7th largest of 7 solar plants there.

The average electricity customer in Calhoun County goes 18 hours a year without power, the 17th most of 67 counties in Florida. The county's page has the full outage record.

Where it is

Big Brook (outlined) and other plants in Calhoun County, shaded. 30.443, -85.262.

Plant facts

Operator
Florida Power & Light Co
Sector
Electric Utility
Grid operator
FPL
County
Calhoun County, FL
EIA plant ID
68820
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 75 MW 2026 –

Questions

Big Brook, answered

How much power does Big Brook produce?

Big Brook has 75 MW of capacity from one generator. No full year of generation is reported yet.

Where is Big Brook?

Big Brook is in Calhoun County, Florida, at about 30.443°, -85.262°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Calhoun County goes 18 hours a year without power, the 17th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Big Brook?

It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.

When did Big Brook open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.