Solar power plant · Calhoun, FL
Sand Pine
Sand Pine is a 75 MW solar power plant in Calhoun County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2026.
Sand Pine in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 158th largest, about 0.5% of the state's 14 GW of solar capacity.
Calhoun County has 7 power plants of 1 MW or more with 820 MW in all; Sand Pine is 9% of that and the 6th largest of 7 solar plants there.
The average electricity customer in Calhoun County goes 18 hours a year without power, the 17th most of 67 counties in Florida. The county's page has the full outage record.
Where it is
Sand Pine (outlined) and other plants in Calhoun County, shaded. 30.448, -85.264.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Calhoun County, FL
- EIA plant ID
- 68818
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2026 | – |
Questions
Sand Pine, answered
How much power does Sand Pine produce?
Sand Pine has 75 MW of capacity from one generator. No full year of generation is reported yet.
Where is Sand Pine?
Sand Pine is in Calhoun County, Florida, at about 30.448°, -85.264°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Calhoun County goes 18 hours a year without power, the 17th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Sand Pine?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Sand Pine open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.