Solar power plant · Calhoun, FL

FPL Chipola River Solar Energy Center

FPL Chipola River Solar Energy Center is a 149 MW solar power plant in Calhoun County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2023. In 2025 it generated 154 GWh, about what 12,000 average Florida homes use in a year.

Capacity149 MWNameplate, September 2026
Generated154 GWhIn 2025
Capacity factor–Not a full year of data
Generators2Oldest from 2023

FPL Chipola River Solar Energy Center in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the largest, about 1.1% of the state's 14 GW of solar capacity.

Calhoun County has 7 power plants of 1 MW or more with 820 MW in all; FPL Chipola River Solar Energy Center is 18% of that and the largest of 7 solar plants there.

The average electricity customer in Calhoun County goes 18 hours a year without power, the 17th most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150200202320242025GWh 154
050100150200202320242025154

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

FPL Chipola River Solar Energy Center (outlined) and other plants in Calhoun County, shaded. 30.455, -85.279.

Plant facts

Operator
Florida Power & Light Co
Sector
Electric Utility
Grid operator
FPL
County
Calhoun County, FL
EIA plant ID
65422
  • Solar75 MW50%
  • Storage75 MW50%
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 75 MW 2023 –
2 Batteries 75 MW · 224 MWh 2025 –

Questions

FPL Chipola River Solar Energy Center, answered

How much power does FPL Chipola River Solar Energy Center produce?

FPL Chipola River Solar Energy Center has 149 MW of capacity from 2 generators. In 2025 it generated 154 GWh.

How many homes does FPL Chipola River Solar Energy Center power?

Its 2025 output of 154 GWh equals the yearly electricity use of about 12,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is FPL Chipola River Solar Energy Center?

FPL Chipola River Solar Energy Center is in Calhoun County, Florida, at about 30.455°, -85.279°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Calhoun County goes 18 hours a year without power, the 17th most of 67 counties in Florida. The county's page has the full outage record.

Who operates FPL Chipola River Solar Energy Center?

It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.

When did FPL Chipola River Solar Energy Center open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.