Wind power plant · Scurry, TX
Brazos Wind Farm
Brazos Wind Farm is a 182 MW wind power plant in Scurry County, Texas, operated by Shell Wind Energy Inc.. Its oldest generator still running came online in 2003. In 2025 it generated 655 GWh, about what 49,000 average Texas homes use in a year.
Brazos Wind Farm in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 118th largest, about 0.4% of the state's 45 GW of wind capacity.
Scurry County has 14 power plants of 1 MW or more with 2.6 GW in all; Brazos Wind Farm is 7% of that and the 4th largest of 7 wind plants there.
Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Scurry County goes 2.5 hours a year without power, the 228th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Brazos Wind Farm (outlined) and other plants in Scurry County, shaded. 32.948, -101.148.
Plant facts
- Operator
- Shell Wind Energy Inc.
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Scurry County, TX
- EIA plant ID
- 56111
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 182 MW | 2003 | – |
Questions
Brazos Wind Farm, answered
How much power does Brazos Wind Farm produce?
Brazos Wind Farm has 182 MW of capacity from one generator. In 2025 it generated 655 GWh, 41% of the most it could have made running flat out all year (its capacity factor).
How many homes does Brazos Wind Farm power?
Its 2025 output of 655 GWh equals the yearly electricity use of about 49,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Brazos Wind Farm?
Brazos Wind Farm is in Scurry County, Texas, at about 32.948°, -101.148°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in Scurry County goes 2.5 hours a year without power, the 228th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Brazos Wind Farm?
It is operated by Shell Wind Energy Inc. (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Brazos Wind Farm open?
Its oldest generator still running came online in 2003.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.