Solar power plant · Scurry, TX

Lumina Solar Project

Lumina Solar Project is a 487 MW solar power plant in Scurry County, Texas, operated by IPX Power USA, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 680 GWh, about what 51,000 average Texas homes use in a year.

Capacity487 MWNameplate, September 2026
Generated680 GWhIn 2025
Capacity factor–Not a full year of data
Generators2Oldest from 2024

Lumina Solar Project in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 9th largest, about 1.3% of the state's 37 GW of solar capacity.

Scurry County has 14 power plants of 1 MW or more with 2.6 GW in all; Lumina Solar Project is 18% of that and the 2nd largest of 2 solar plants there.

The average electricity customer in Scurry County goes 2.5 hours a year without power, the 228th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020242025GWh 680
020040060080020242025680

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Lumina Solar Project (outlined) and other plants in Scurry County, shaded. 32.901, -100.983.

Plant facts

Operator
IPX Power USA, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Scurry County, TX
EIA plant ID
65645
  • Solar327 MW67%
  • Storage160 MW33%
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
LUMIN Solar Photovoltaic 327 MW 2024 –
LU1BA Batteries 160 MW · 320 MWh 2025 –

Questions

Lumina Solar Project, answered

How much power does Lumina Solar Project produce?

Lumina Solar Project has 487 MW of capacity from 2 generators. In 2025 it generated 680 GWh.

How many homes does Lumina Solar Project power?

Its 2025 output of 680 GWh equals the yearly electricity use of about 51,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Lumina Solar Project?

Lumina Solar Project is in Scurry County, Texas, at about 32.901°, -100.983°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in Scurry County goes 2.5 hours a year without power, the 228th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Lumina Solar Project?

It is operated by IPX Power USA, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Lumina Solar Project open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.