Natural gas power plant · Scurry, TX
EG178 Facility
EG178 Facility is a 154 MW natural gas power plant in Scurry County, Texas, operated by Kinder Morgan Production Company LP. Its oldest generator still running came online in 2005. In 2025 it generated 796 GWh, about what 60,000 average Texas homes use in a year.
EG178 Facility in context
Among the 309 natural gas plants in Texas in the EIA's inventory, it is the 125th largest, about 0.2% of the state's 83 GW of natural gas capacity.
Scurry County has 14 power plants of 1 MW or more with 2.6 GW in all; EG178 Facility is 6% of that and the largest of 2 natural gas plants there.
Its capacity factor of 59% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Scurry County goes 2.5 hours a year without power, the 228th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
EG178 Facility (outlined) and other plants in Scurry County, shaded. 32.747, -100.955.
Plant facts
- Operator
- Kinder Morgan Production Company LP
- Sector
- Industrial Non-CHP
- Grid operator
- ERCO
- County
- Scurry County, TX
- EIA plant ID
- 56233
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CT02 | Natural Gas Fired Combined Cycle | 61 MW | 2005 | – |
| CTG1 | Natural Gas Fired Combined Cycle | 61 MW | 2005 | – |
| STG | Natural Gas Fired Combined Cycle | 33 MW | 2005 | – |
Questions
EG178 Facility, answered
How much power does EG178 Facility produce?
EG178 Facility has 154 MW of capacity from 3 generators. In 2025 it generated 796 GWh, 59% of the most it could have made running flat out all year (its capacity factor).
How many homes does EG178 Facility power?
Its 2025 output of 796 GWh equals the yearly electricity use of about 60,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is EG178 Facility?
EG178 Facility is in Scurry County, Texas, at about 32.747°, -100.955°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in Scurry County goes 2.5 hours a year without power, the 228th most of 240 counties in Texas. The county's page has the full outage record.
Who operates EG178 Facility?
It is operated by Kinder Morgan Production Company LP (EIA sector: Industrial Non-CHP), and it feeds ERCOT, the Texas grid.
When did EG178 Facility open?
Its oldest generator still running came online in 2005.