Wind power plant · Converse, WY
Campbell Hill Windpower
Campbell Hill Windpower is a 99 MW wind power plant in Converse County, Wyoming, operated by Deriva Energy. Its oldest generator still running came online in 2009. In 2025 it generated 254 GWh, about what 25,000 average Wyoming homes use in a year.
Campbell Hill Windpower in context
Among the 28 wind plants in Wyoming in the EIA's inventory, it is the 20th largest, about 2.1% of the state's 4.7 GW of wind capacity.
Converse County has 10 power plants of 1 MW or more with 2.4 GW in all; Campbell Hill Windpower is 4% of that and the 8th largest of 9 wind plants there.
Its capacity factor of 29% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Converse County goes 7.5 hours a year without power, the 2nd most of 20 counties in Wyoming. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Campbell Hill Windpower (outlined) and other plants in Converse County, shaded. 43.015, -105.999.
Plant facts
- Operator
- Deriva Energy
- Sector
- IPP Non-CHP
- Grid operator
- PACE
- County
- Converse County, WY
- EIA plant ID
- 57090
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CHWF | Onshore Wind Turbine | 99 MW | 2009 | – |
Questions
Campbell Hill Windpower, answered
How much power does Campbell Hill Windpower produce?
Campbell Hill Windpower has 99 MW of capacity from one generator. In 2025 it generated 254 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does Campbell Hill Windpower power?
Its 2025 output of 254 GWh equals the yearly electricity use of about 25,000 average Wyoming homes (835 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Campbell Hill Windpower?
Campbell Hill Windpower is in Converse County, Wyoming, at about 43.015°, -105.999°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Converse County goes 7.5 hours a year without power, the 2nd most of 20 counties in Wyoming. The county's page has the full outage record.
Who operates Campbell Hill Windpower?
It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.
When did Campbell Hill Windpower open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Wyoming home's 835 kWh a month in 2025. Methodology.