Wind power plant · Converse, WY
Glenrock
Glenrock is a 166 MW wind power plant in Converse County, Wyoming, operated by PacifiCorp. Its oldest generator still running came online in 2008. In 2025 it generated 469 GWh, about what 47,000 average Wyoming homes use in a year.
Glenrock in context
Among the 28 wind plants in Wyoming in the EIA's inventory, it is the 10th largest, about 3.5% of the state's 4.7 GW of wind capacity.
Converse County has 10 power plants of 1 MW or more with 2.4 GW in all; Glenrock is 7% of that and the 5th largest of 9 wind plants there.
Its capacity factor of 32% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Converse County goes 7.5 hours a year without power, the 2nd most of 20 counties in Wyoming. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Glenrock (outlined) and other plants in Converse County, shaded. 43.018, -105.835.
Plant facts
- Operator
- PacifiCorp
- Sector
- Electric Utility
- Grid operator
- PACE
- County
- Converse County, WY
- EIA plant ID
- 56841
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 120 MW | 2008 | – |
| 2 | Onshore Wind Turbine | 46 MW | 2009 | – |
Questions
Glenrock, answered
How much power does Glenrock produce?
Glenrock has 166 MW of capacity from 2 generators. In 2025 it generated 469 GWh, 32% of the most it could have made running flat out all year (its capacity factor).
How many homes does Glenrock power?
Its 2025 output of 469 GWh equals the yearly electricity use of about 47,000 average Wyoming homes (835 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Glenrock?
Glenrock is in Converse County, Wyoming, at about 43.018°, -105.835°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Converse County goes 7.5 hours a year without power, the 2nd most of 20 counties in Wyoming. The county's page has the full outage record.
Who operates Glenrock?
It is operated by PacifiCorp (EIA sector: Electric Utility), and it feeds PacifiCorp East.
When did Glenrock open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Wyoming home's 835 kWh a month in 2025. Methodology.