Wind power plant · Converse, WY
Cedar Springs Wind IV
Cedar Springs Wind IV is a 390 MW wind power plant in Converse County, Wyoming, operated by Cedar Springs Wind IV, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 1.1 TWh, about what 105,000 average Wyoming homes use in a year.
Cedar Springs Wind IV in context
Among the 28 wind plants in Wyoming in the EIA's inventory, it is the 3rd largest, about 8.3% of the state's 4.7 GW of wind capacity.
Converse County has 10 power plants of 1 MW or more with 2.4 GW in all; Cedar Springs Wind IV is 16% of that and the largest of 9 wind plants there.
The average electricity customer in Converse County goes 7.5 hours a year without power, the 2nd most of 20 counties in Wyoming. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Cedar Springs Wind IV (outlined) and other plants in Converse County, shaded. 43.101, -105.712.
Plant facts
- Operator
- Cedar Springs Wind IV, LLC
- Sector
- IPP Non-CHP
- Grid operator
- WACM
- County
- Converse County, WY
- EIA plant ID
- 67289
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CS4 | Onshore Wind Turbine | 390 MW | 2025 | – |
Questions
Cedar Springs Wind IV, answered
How much power does Cedar Springs Wind IV produce?
Cedar Springs Wind IV has 390 MW of capacity from one generator. In 2025 it generated 1.1 TWh.
How many homes does Cedar Springs Wind IV power?
Its 2025 output of 1.1 TWh equals the yearly electricity use of about 105,000 average Wyoming homes (835 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cedar Springs Wind IV?
Cedar Springs Wind IV is in Converse County, Wyoming, at about 43.101°, -105.712°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Converse County goes 7.5 hours a year without power, the 2nd most of 20 counties in Wyoming. The county's page has the full outage record.
Who operates Cedar Springs Wind IV?
It is operated by Cedar Springs Wind IV, LLC (EIA sector: IPP Non-CHP), and it feeds WAPA Rocky Mountain.
When did Cedar Springs Wind IV open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Wyoming home's 835 kWh a month in 2025. Methodology.