Wind power plant · Converse, WY
Cedar Springs II
Cedar Springs II is a 200 MW wind power plant in Converse County, Wyoming, operated by PacifiCorp. Its oldest generator still running came online in 2020. In 2025 it generated 652 GWh, about what 65,000 average Wyoming homes use in a year.
Cedar Springs II in context
Among the 28 wind plants in Wyoming in the EIA's inventory, it is the 9th largest, about 4.2% of the state's 4.7 GW of wind capacity.
Converse County has 10 power plants of 1 MW or more with 2.4 GW in all; Cedar Springs II is 8% of that and the 4th largest of 9 wind plants there.
Its capacity factor of 37% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Converse County goes 7.5 hours a year without power, the 2nd most of 20 counties in Wyoming. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cedar Springs II (outlined) and other plants in Converse County, shaded. 42.969, -105.366.
Plant facts
- Operator
- PacifiCorp
- Sector
- Electric Utility
- Grid operator
- PACE
- County
- Converse County, WY
- EIA plant ID
- 63915
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 82634 | Onshore Wind Turbine | 200 MW | 2020 | – |
Questions
Cedar Springs II, answered
How much power does Cedar Springs II produce?
Cedar Springs II has 200 MW of capacity from one generator. In 2025 it generated 652 GWh, 37% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cedar Springs II power?
Its 2025 output of 652 GWh equals the yearly electricity use of about 65,000 average Wyoming homes (835 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cedar Springs II?
Cedar Springs II is in Converse County, Wyoming, at about 42.969°, -105.366°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Converse County goes 7.5 hours a year without power, the 2nd most of 20 counties in Wyoming. The county's page has the full outage record.
Who operates Cedar Springs II?
It is operated by PacifiCorp (EIA sector: Electric Utility), and it feeds PacifiCorp East.
When did Cedar Springs II open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Wyoming home's 835 kWh a month in 2025. Methodology.