Wind power plant · Eastland, TX
Century Oak Wind Project, LLC
Century Oak Wind Project, LLC is a 152 MW wind power plant in Eastland County, Texas, operated by Century Oak Wind Project, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 526 GWh, about what 39,000 average Texas homes use in a year.
Century Oak Wind Project, LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 145th largest, about 0.3% of the state's 45 GW of wind capacity.
Eastland County has 6 power plants of 1 MW or more with 1.1 GW in all; Century Oak Wind Project, LLC is 13% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 40% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Century Oak Wind Project, LLC (outlined) and other plants in Eastland County, shaded. 32.429, -99.159.
Plant facts
- Operator
- Century Oak Wind Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Eastland County, TX
- EIA plant ID
- 67425
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| COAKW | Onshore Wind Turbine | 152 MW | 2024 | – |
Nearby
Other plants in Eastland County
Questions
Century Oak Wind Project, LLC, answered
How much power does Century Oak Wind Project, LLC produce?
Century Oak Wind Project, LLC has 152 MW of capacity from one generator. In 2025 it generated 526 GWh, 40% of the most it could have made running flat out all year (its capacity factor).
How many homes does Century Oak Wind Project, LLC power?
Its 2025 output of 526 GWh equals the yearly electricity use of about 39,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Century Oak Wind Project, LLC?
Century Oak Wind Project, LLC is in Eastland County, Texas, at about 32.429°, -99.159°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Century Oak Wind Project, LLC?
It is operated by Century Oak Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Century Oak Wind Project, LLC open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.