Solar power plant · Eastland, TX

Sequoia 1

Sequoia 1 is a 401 MW solar power plant in Eastland County, Texas, operated by Sequoia 1 Solar Project. Its oldest generator still running came online in 2025. In 2025 it generated 21 GWh, about what 1,600 average Texas homes use in a year.

Capacity401 MWNameplate, September 2026
Generated21 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Sequoia 1 in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 19th largest, about 1.1% of the state's 37 GW of solar capacity.

Eastland County has 6 power plants of 1 MW or more with 1.1 GW in all; Sequoia 1 is 35% of that.

The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Sequoia 1 (outlined) and other plants in Eastland County, shaded. 32.438, -99.158.

Plant facts

Operator
Sequoia 1 Solar Project
Sector
IPP Non-CHP
Grid operator
ERCO
County
Eastland County, TX
EIA plant ID
68200
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SEQ1 Solar Photovoltaic 401 MW 2025 –

Questions

Sequoia 1, answered

How much power does Sequoia 1 produce?

Sequoia 1 has 401 MW of capacity from one generator. In 2025 it generated 21 GWh.

How many homes does Sequoia 1 power?

Its 2025 output of 21 GWh equals the yearly electricity use of about 1,600 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Sequoia 1?

Sequoia 1 is in Eastland County, Texas, at about 32.438°, -99.158°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Sequoia 1?

It is operated by Sequoia 1 Solar Project (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Sequoia 1 open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.