Solar power plant · Eastland, TX
Sequoia 1
Sequoia 1 is a 401 MW solar power plant in Eastland County, Texas, operated by Sequoia 1 Solar Project. Its oldest generator still running came online in 2025. In 2025 it generated 21 GWh, about what 1,600 average Texas homes use in a year.
Sequoia 1 in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 19th largest, about 1.1% of the state's 37 GW of solar capacity.
Eastland County has 6 power plants of 1 MW or more with 1.1 GW in all; Sequoia 1 is 35% of that.
The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Sequoia 1 (outlined) and other plants in Eastland County, shaded. 32.438, -99.158.
Plant facts
- Operator
- Sequoia 1 Solar Project
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Eastland County, TX
- EIA plant ID
- 68200
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SEQ1 | Solar Photovoltaic | 401 MW | 2025 | – |
Nearby
Other plants in Eastland County
Questions
Sequoia 1, answered
How much power does Sequoia 1 produce?
Sequoia 1 has 401 MW of capacity from one generator. In 2025 it generated 21 GWh.
How many homes does Sequoia 1 power?
Its 2025 output of 21 GWh equals the yearly electricity use of about 1,600 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sequoia 1?
Sequoia 1 is in Eastland County, Texas, at about 32.438°, -99.158°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Sequoia 1?
It is operated by Sequoia 1 Solar Project (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Sequoia 1 open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.