Storage power plant · Eastland, TX
Longhorn Storage
Longhorn Storage is a 165 MW storage power plant in Eastland County, Texas, operated by Longhorn Storage LLC. Its oldest generator still running came online in 2024.
Longhorn Storage in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 35th largest, about 1.0% of the state's 16 GW of storage capacity.
Eastland County has 6 power plants of 1 MW or more with 1.1 GW in all; Longhorn Storage is 15% of that and the largest of 3 storage plants there.
The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Longhorn Storage (outlined) and other plants in Eastland County, shaded. 32.429, -99.159.
Plant facts
- Operator
- Longhorn Storage LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Eastland County, TX
- EIA plant ID
- 68878
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| LONGH | Batteries | 165 MW · 165 MWh | 2024 | – |
Nearby
Other plants in Eastland County
Questions
Longhorn Storage, answered
How much can Longhorn Storage store and deliver?
Longhorn Storage can deliver up to 165 MW and hold 165 MWh of energy, from one battery or storage system. Its net energy in 2025 was -8.6 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Longhorn Storage?
Longhorn Storage is in Eastland County, Texas, at about 32.429°, -99.159°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Longhorn Storage?
It is operated by Longhorn Storage LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Longhorn Storage open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.