Wind power plant · Eastland, TX

Roadrunner Wind Farm

Roadrunner Wind Farm is a 256 MW wind power plant in Eastland County, Texas, operated by Roadrunner Crossing Wind Farm, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 932 GWh, about what 70,000 average Texas homes use in a year.

Capacity256 MWNameplate, September 2026
Generated932 GWhIn 2025
Capacity factor42%Share of the most it could make, 2025
Generators1Oldest from 2024

Roadrunner Wind Farm in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 48th largest, about 0.6% of the state's 45 GW of wind capacity.

Eastland County has 6 power plants of 1 MW or more with 1.1 GW in all; Roadrunner Wind Farm is 23% of that and the largest of 2 wind plants there.

Its capacity factor of 42% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,0001,20020242025GWh 932
02004006008001,0001,20020242025932

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Roadrunner Wind Farm (outlined) and other plants in Eastland County, shaded. 32.437, -99.109.

Plant facts

Operator
Roadrunner Crossing Wind Farm, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Eastland County, TX
EIA plant ID
66902
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
5317 Onshore Wind Turbine 256 MW 2024 –

Questions

Roadrunner Wind Farm, answered

How much power does Roadrunner Wind Farm produce?

Roadrunner Wind Farm has 256 MW of capacity from one generator. In 2025 it generated 932 GWh, 42% of the most it could have made running flat out all year (its capacity factor).

How many homes does Roadrunner Wind Farm power?

Its 2025 output of 932 GWh equals the yearly electricity use of about 70,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Roadrunner Wind Farm?

Roadrunner Wind Farm is in Eastland County, Texas, at about 32.437°, -99.109°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Roadrunner Wind Farm?

It is operated by Roadrunner Crossing Wind Farm, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Roadrunner Wind Farm open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.