Storage power plant · Eastland, TX

Roadrunner Crossing Energy Storage

Roadrunner Crossing Energy Storage is a 150 MW storage power plant in Eastland County, Texas, operated by Roadrunner Crossing Energy Storage LLC. Its oldest generator still running came online in 2025.

Capacity150 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Roadrunner Crossing Energy Storage in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 45th largest, about 0.9% of the state's 16 GW of storage capacity.

Eastland County has 6 power plants of 1 MW or more with 1.1 GW in all; Roadrunner Crossing Energy Storage is 13% of that and the 2nd largest of 3 storage plants there.

The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Roadrunner Crossing Energy Storage (outlined) and other plants in Eastland County, shaded. 32.414, -99.108.

Plant facts

Operator
Roadrunner Crossing Energy Storage LLC
Sector
Industrial Non-CHP
Grid operator
ERCO
County
Eastland County, TX
EIA plant ID
68460
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
7137 Batteries 150 MW · 150 MWh 2025 –

Questions

Roadrunner Crossing Energy Storage, answered

How much can Roadrunner Crossing Energy Storage store and deliver?

Roadrunner Crossing Energy Storage can deliver up to 150 MW and hold 150 MWh of energy, from one battery or storage system.

Where is Roadrunner Crossing Energy Storage?

Roadrunner Crossing Energy Storage is in Eastland County, Texas, at about 32.414°, -99.108°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Eastland County goes 16 hours a year without power, the 62nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Roadrunner Crossing Energy Storage?

It is operated by Roadrunner Crossing Energy Storage LLC (EIA sector: Industrial Non-CHP), and it feeds ERCOT, the Texas grid.

When did Roadrunner Crossing Energy Storage open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.