Solar power plant · DeSoto, FL

Citrus Solar Energy Center Hybrid

Citrus Solar Energy Center Hybrid is a 79 MW solar power plant in DeSoto County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2016. In 2025 it generated 138 GWh, about what 10,000 average Florida homes use in a year.

Capacity79 MWNameplate, September 2026
Generated138 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators2Oldest from 2016

Citrus Solar Energy Center Hybrid in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 13th largest, about 0.6% of the state's 14 GW of solar capacity.

DeSoto County has 9 power plants of 1 MW or more with 625 MW in all; Citrus Solar Energy Center Hybrid is 13% of that and the largest of 9 solar plants there.

Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in DeSoto County goes 16 hours a year without power, the 24th most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020182019202020212022202320242025GWh 138
0501001502002019202120232025138

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Citrus Solar Energy Center Hybrid (outlined) and other plants in DeSoto County, shaded. 27.321, -81.807.

Plant facts

Operator
Florida Power & Light Co
Sector
Electric Utility
Grid operator
FPL
County
DeSoto County, FL
EIA plant ID
60061
  • Solar75 MW95%
  • Storage4.0 MW5.1%
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 75 MW 2016 –
BA Batteries 4.0 MW · 16 MWh 2018 –

Questions

Citrus Solar Energy Center Hybrid, answered

How much power does Citrus Solar Energy Center Hybrid produce?

Citrus Solar Energy Center Hybrid has 79 MW of capacity from 2 generators. In 2025 it generated 138 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Citrus Solar Energy Center Hybrid power?

Its 2025 output of 138 GWh equals the yearly electricity use of about 10,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Citrus Solar Energy Center Hybrid?

Citrus Solar Energy Center Hybrid is in DeSoto County, Florida, at about 27.321°, -81.807°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in DeSoto County goes 16 hours a year without power, the 24th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Citrus Solar Energy Center Hybrid?

It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.

When did Citrus Solar Energy Center Hybrid open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.