Solar power plant · DeSoto, FL
Prairie Creek FL
Prairie Creek FL is a 75 MW solar power plant in DeSoto County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2024. In 2025 it generated 166 GWh, about what 13,000 average Florida homes use in a year.
Prairie Creek FL in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 110th largest, about 0.5% of the state's 14 GW of solar capacity.
DeSoto County has 9 power plants of 1 MW or more with 625 MW in all; Prairie Creek FL is 12% of that and the 5th largest of 9 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in DeSoto County goes 16 hours a year without power, the 24th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Prairie Creek FL (outlined) and other plants in DeSoto County, shaded. 27.074, -81.697.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- DeSoto County, FL
- EIA plant ID
- 65868
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2024 | – |
Questions
Prairie Creek FL, answered
How much power does Prairie Creek FL produce?
Prairie Creek FL has 75 MW of capacity from one generator. In 2025 it generated 166 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Prairie Creek FL power?
Its 2025 output of 166 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Prairie Creek FL?
Prairie Creek FL is in DeSoto County, Florida, at about 27.074°, -81.697°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in DeSoto County goes 16 hours a year without power, the 24th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Prairie Creek FL?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Prairie Creek FL open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.