Solar power plant · DeSoto, FL
DeSoto Next Generation Solar Energy
DeSoto Next Generation Solar Energy is a 25 MW solar power plant in DeSoto County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2009. In 2025 it generated 31 GWh, about what 2,300 average Florida homes use in a year.
DeSoto Next Generation Solar Energy in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 185th largest, about 0.2% of the state's 14 GW of solar capacity.
DeSoto County has 9 power plants of 1 MW or more with 625 MW in all; DeSoto Next Generation Solar Energy is 4% of that and the 9th largest of 9 solar plants there.
Its capacity factor of 14% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in DeSoto County goes 16 hours a year without power, the 24th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
DeSoto Next Generation Solar Energy (outlined) and other plants in DeSoto County, shaded. 27.323, -81.802.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- DeSoto County, FL
- EIA plant ID
- 56929
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 25 MW | 2009 | – |
Questions
DeSoto Next Generation Solar Energy, answered
How much power does DeSoto Next Generation Solar Energy produce?
DeSoto Next Generation Solar Energy has 25 MW of capacity from one generator. In 2025 it generated 31 GWh, 14% of the most it could have made running flat out all year (its capacity factor).
How many homes does DeSoto Next Generation Solar Energy power?
Its 2025 output of 31 GWh equals the yearly electricity use of about 2,300 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is DeSoto Next Generation Solar Energy?
DeSoto Next Generation Solar Energy is in DeSoto County, Florida, at about 27.323°, -81.802°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in DeSoto County goes 16 hours a year without power, the 24th most of 67 counties in Florida. The county's page has the full outage record.
Who operates DeSoto Next Generation Solar Energy?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did DeSoto Next Generation Solar Energy open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.