Solar power plant · Manatee, FL

Duette Solar Power Plant

Duette Solar Power Plant is a 75 MW solar power plant in Manatee County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 170 GWh, about what 13,000 average Florida homes use in a year.

Capacity75 MWNameplate, September 2026
Generated170 GWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators1Oldest from 2021

Duette Solar Power Plant in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 78th largest, about 0.5% of the state's 14 GW of solar capacity.

Manatee County has 12 power plants of 1 MW or more with 4.2 GW in all; Duette Solar Power Plant is 2% of that and the 3rd largest of 9 solar plants there.

Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020212022202320242025GWh 170
05010015020020212022202320242025170

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Duette Solar Power Plant (outlined) and other plants in Manatee County, shaded. 27.586, -82.062.

Plant facts

Operator
Duke Energy Florida, LLC
Sector
Electric Utility
Grid operator
FPC
County
Manatee County, FL
EIA plant ID
63978
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 75 MW 2021 –

Questions

Duette Solar Power Plant, answered

How much power does Duette Solar Power Plant produce?

Duette Solar Power Plant has 75 MW of capacity from one generator. In 2025 it generated 170 GWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does Duette Solar Power Plant power?

Its 2025 output of 170 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Duette Solar Power Plant?

Duette Solar Power Plant is in Manatee County, Florida, at about 27.586°, -82.062°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Duette Solar Power Plant?

It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.

When did Duette Solar Power Plant open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.