Natural gas power plant · Manatee, FL
Manatee
Manatee is a 3.0 GW natural gas power plant in Manatee County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 1976. In 2025 it generated 7.1 TWh, about what 539,000 average Florida homes use in a year.
Manatee in context
Among the 68 natural gas plants in Florida in the EIA's inventory, it is the 3rd largest, about 5.3% of the state's 56 GW of natural gas capacity.
Manatee County has 12 power plants of 1 MW or more with 4.2 GW in all; Manatee is 71% of that and the largest of 2 natural gas plants there.
Its capacity factor of 28% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Manatee (outlined) and other plants in Manatee County, shaded. 27.606, -82.346.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Manatee County, FL
- EIA plant ID
- 6042
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Natural Gas Steam Turbine | 863 MW | 1976 | – |
| 2 | Natural Gas Steam Turbine | 863 MW | 1977 | – |
| 3 | Natural Gas Fired Combined Cycle | 472 MW | 2005 | – |
| A | Natural Gas Fired Combined Cycle | 188 MW | 2005 | – |
| B | Natural Gas Fired Combined Cycle | 188 MW | 2005 | – |
| C | Natural Gas Fired Combined Cycle | 188 MW | 2005 | – |
| D | Natural Gas Fired Combined Cycle | 188 MW | 2005 | – |
Questions
Manatee, answered
How much power does Manatee produce?
Manatee has 3.0 GW of capacity from 7 generators. In 2025 it generated 7.1 TWh, 28% of the most it could have made running flat out all year (its capacity factor).
How many homes does Manatee power?
Its 2025 output of 7.1 TWh equals the yearly electricity use of about 539,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Manatee?
Manatee is in Manatee County, Florida, at about 27.606°, -82.346°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Manatee?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Manatee open?
Its oldest generator still running came online in 1976.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.