Solar power plant · Manatee, FL
Long Branch Solar
Long Branch Solar is a 75 MW solar power plant in Manatee County, Florida, operated by Tampa Electric Co. Its oldest generator still running came online in 2026.
Long Branch Solar in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 36th largest, about 0.5% of the state's 14 GW of solar capacity.
Manatee County has 12 power plants of 1 MW or more with 4.2 GW in all; Long Branch Solar is 2% of that and the largest of 9 solar plants there.
The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.
Where it is
Long Branch Solar (outlined) and other plants in Manatee County, shaded. 27.626, -82.171.
Plant facts
- Operator
- Tampa Electric Co
- Sector
- Electric Utility
- Grid operator
- TEC
- County
- Manatee County, FL
- EIA plant ID
- 68472
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2026 | – |
Questions
Long Branch Solar, answered
How much power does Long Branch Solar produce?
Long Branch Solar has 75 MW of capacity from one generator. No full year of generation is reported yet.
Where is Long Branch Solar?
Long Branch Solar is in Manatee County, Florida, at about 27.626°, -82.171°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Long Branch Solar?
It is operated by Tampa Electric Co (EIA sector: Electric Utility), and it feeds balancing authority TEC.
When did Long Branch Solar open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.