Solar power plant · Manatee, FL
Three Creeks
Three Creeks is a 75 MW solar power plant in Manatee County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2024. In 2025 it generated 175 GWh, about what 13,000 average Florida homes use in a year.
Three Creeks in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 106th largest, about 0.5% of the state's 14 GW of solar capacity.
Manatee County has 12 power plants of 1 MW or more with 4.2 GW in all; Three Creeks is 2% of that and the 6th largest of 9 solar plants there.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Three Creeks (outlined) and other plants in Manatee County, shaded. 27.579, -82.261.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Manatee County, FL
- EIA plant ID
- 65863
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2024 | – |
Questions
Three Creeks, answered
How much power does Three Creeks produce?
Three Creeks has 75 MW of capacity from one generator. In 2025 it generated 175 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Three Creeks power?
Its 2025 output of 175 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Three Creeks?
Three Creeks is in Manatee County, Florida, at about 27.579°, -82.261°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Three Creeks?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Three Creeks open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.