Wind power plant · Howard, TX
Elbow Creek Wind Project LLC
Elbow Creek Wind Project LLC is a 122 MW wind power plant in Howard County, Texas, operated by Elbow Creek Wind Project LLC. Its oldest generator still running came online in 2008. In 2025 it generated 358 GWh, about what 27,000 average Texas homes use in a year.
Elbow Creek Wind Project LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 174th largest, about 0.3% of the state's 45 GW of wind capacity.
Howard County has 7 power plants of 1 MW or more with 657 MW in all; Elbow Creek Wind Project LLC is 19% of that and the 2nd largest of 5 wind plants there.
Its capacity factor of 34% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Howard County goes 6.5 hours a year without power, the 178th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Elbow Creek Wind Project LLC (outlined) and other plants in Howard County, shaded. 32.141, -101.399.
Plant facts
- Operator
- Elbow Creek Wind Project LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Howard County, TX
- EIA plant ID
- 56783
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 122 MW | 2008 | – |
Questions
Elbow Creek Wind Project LLC, answered
How much power does Elbow Creek Wind Project LLC produce?
Elbow Creek Wind Project LLC has 122 MW of capacity from one generator. In 2025 it generated 358 GWh, 34% of the most it could have made running flat out all year (its capacity factor).
How many homes does Elbow Creek Wind Project LLC power?
Its 2025 output of 358 GWh equals the yearly electricity use of about 27,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Elbow Creek Wind Project LLC?
Elbow Creek Wind Project LLC is in Howard County, Texas, at about 32.141°, -101.399°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Howard County goes 6.5 hours a year without power, the 178th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Elbow Creek Wind Project LLC?
It is operated by Elbow Creek Wind Project LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Elbow Creek Wind Project LLC open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.