Wind power plant · Howard, TX
Ocotillo Windpower
Ocotillo Windpower is a 59 MW wind power plant in Howard County, Texas, operated by Deriva Energy. Its oldest generator still running came online in 2008. In 2025 it generated 79 GWh, about what 6,000 average Texas homes use in a year.
Ocotillo Windpower in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 210th largest, about 0.1% of the state's 45 GW of wind capacity.
Howard County has 7 power plants of 1 MW or more with 657 MW in all; Ocotillo Windpower is 9% of that and the 4th largest of 5 wind plants there.
Its capacity factor of 15% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Howard County goes 6.5 hours a year without power, the 178th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Ocotillo Windpower (outlined) and other plants in Howard County, shaded. 32.122, -101.385.
Plant facts
- Operator
- Deriva Energy
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Howard County, TX
- EIA plant ID
- 56959
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OWF | Onshore Wind Turbine | 59 MW | 2008 | – |
Questions
Ocotillo Windpower, answered
How much power does Ocotillo Windpower produce?
Ocotillo Windpower has 59 MW of capacity from one generator. In 2025 it generated 79 GWh, 15% of the most it could have made running flat out all year (its capacity factor).
How many homes does Ocotillo Windpower power?
Its 2025 output of 79 GWh equals the yearly electricity use of about 6,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Ocotillo Windpower?
Ocotillo Windpower is in Howard County, Texas, at about 32.122°, -101.385°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Howard County goes 6.5 hours a year without power, the 178th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Ocotillo Windpower?
It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Ocotillo Windpower open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.