Solar power plant · Howard, TX
Highpeak Solar 1
Highpeak Solar 1 is a 10 MW solar power plant in Howard County, Texas, operated by PPM Solar LLC. Its oldest generator still running came online in 2024. In 2025 it generated 24 GWh, about what 1,800 average Texas homes use in a year.
Highpeak Solar 1 in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 196th largest, about 0.0% of the state's 37 GW of solar capacity.
Howard County has 7 power plants of 1 MW or more with 657 MW in all; Highpeak Solar 1 is 2% of that.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Howard County goes 6.5 hours a year without power, the 178th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Highpeak Solar 1 (outlined) and other plants in Howard County, shaded. 32.494, -101.277.
Plant facts
- Operator
- PPM Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Howard County, TX
- EIA plant ID
- 66572
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| HPKS1 | Solar Photovoltaic | 10 MW | 2024 | – |
Questions
Highpeak Solar 1, answered
How much power does Highpeak Solar 1 produce?
Highpeak Solar 1 has 10 MW of capacity from one generator. In 2025 it generated 24 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Highpeak Solar 1 power?
Its 2025 output of 24 GWh equals the yearly electricity use of about 1,800 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Highpeak Solar 1?
Highpeak Solar 1 is in Howard County, Texas, at about 32.494°, -101.277°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Howard County goes 6.5 hours a year without power, the 178th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Highpeak Solar 1?
It is operated by PPM Solar LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Highpeak Solar 1 open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.