Wind power plant · Howard, TX
Gunsight Mountain Wind Energy LLC
Gunsight Mountain Wind Energy LLC is a 120 MW wind power plant in Howard County, Texas, operated by Invenergy Services LLC. Its oldest generator still running came online in 2016. In 2025 it generated 431 GWh, about what 32,000 average Texas homes use in a year.
Gunsight Mountain Wind Energy LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 178th largest, about 0.3% of the state's 45 GW of wind capacity.
Howard County has 7 power plants of 1 MW or more with 657 MW in all; Gunsight Mountain Wind Energy LLC is 18% of that and the 3rd largest of 5 wind plants there.
Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Howard County goes 6.5 hours a year without power, the 178th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Gunsight Mountain Wind Energy LLC (outlined) and other plants in Howard County, shaded. 32.240, -101.474.
Plant facts
- Operator
- Invenergy Services LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Howard County, TX
- EIA plant ID
- 56776
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 120 MW | 2016 | – |
Questions
Gunsight Mountain Wind Energy LLC, answered
How much power does Gunsight Mountain Wind Energy LLC produce?
Gunsight Mountain Wind Energy LLC has 120 MW of capacity from one generator. In 2025 it generated 431 GWh, 41% of the most it could have made running flat out all year (its capacity factor).
How many homes does Gunsight Mountain Wind Energy LLC power?
Its 2025 output of 431 GWh equals the yearly electricity use of about 32,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Gunsight Mountain Wind Energy LLC?
Gunsight Mountain Wind Energy LLC is in Howard County, Texas, at about 32.240°, -101.474°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Howard County goes 6.5 hours a year without power, the 178th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Gunsight Mountain Wind Energy LLC?
It is operated by Invenergy Services LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Gunsight Mountain Wind Energy LLC open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.