Solar power plant · St. Lucie, FL
Interstate Solar Energy Center
Interstate Solar Energy Center is a 75 MW solar power plant in St. Lucie County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2019. In 2025 it generated 135 GWh, about what 10,000 average Florida homes use in a year.
Interstate Solar Energy Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 51st largest, about 0.5% of the state's 14 GW of solar capacity.
St. Lucie County has 14 power plants of 1 MW or more with 3.5 GW in all; Interstate Solar Energy Center is 2% of that and the 2nd largest of 12 solar plants there.
Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in St. Lucie County goes 2.7 hours a year without power, the 62nd most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Interstate Solar Energy Center (outlined) and other plants in St. Lucie County, shaded. 27.500, -80.440.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- St. Lucie County, FL
- EIA plant ID
- 61768
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2019 | – |
Questions
Interstate Solar Energy Center, answered
How much power does Interstate Solar Energy Center produce?
Interstate Solar Energy Center has 75 MW of capacity from one generator. In 2025 it generated 135 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Interstate Solar Energy Center power?
Its 2025 output of 135 GWh equals the yearly electricity use of about 10,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Interstate Solar Energy Center?
Interstate Solar Energy Center is in St. Lucie County, Florida, at about 27.500°, -80.440°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in St. Lucie County goes 2.7 hours a year without power, the 62nd most of 67 counties in Florida. The county's page has the full outage record.
Who operates Interstate Solar Energy Center?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Interstate Solar Energy Center open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.