Solar power plant · St. Lucie, FL
Loggerhead Solar Energy Center
Loggerhead Solar Energy Center is a 75 MW solar power plant in St. Lucie County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2018. In 2025 it generated 128 GWh, about what 9,700 average Florida homes use in a year.
Loggerhead Solar Energy Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 47th largest, about 0.5% of the state's 14 GW of solar capacity.
St. Lucie County has 14 power plants of 1 MW or more with 3.5 GW in all; Loggerhead Solar Energy Center is 2% of that and the largest of 12 solar plants there.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in St. Lucie County goes 2.7 hours a year without power, the 62nd most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Loggerhead Solar Energy Center (outlined) and other plants in St. Lucie County, shaded. 27.238, -80.541.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- St. Lucie County, FL
- EIA plant ID
- 61052
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2018 | – |
Questions
Loggerhead Solar Energy Center, answered
How much power does Loggerhead Solar Energy Center produce?
Loggerhead Solar Energy Center has 75 MW of capacity from one generator. In 2025 it generated 128 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Loggerhead Solar Energy Center power?
Its 2025 output of 128 GWh equals the yearly electricity use of about 9,700 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Loggerhead Solar Energy Center?
Loggerhead Solar Energy Center is in St. Lucie County, Florida, at about 27.238°, -80.541°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in St. Lucie County goes 2.7 hours a year without power, the 62nd most of 67 counties in Florida. The county's page has the full outage record.
Who operates Loggerhead Solar Energy Center?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Loggerhead Solar Energy Center open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.