Solar power plant · St. Lucie, FL
Pelican Solar Center
Pelican Solar Center is a 75 MW solar power plant in St. Lucie County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2021. In 2025 it generated 151 GWh, about what 11,000 average Florida homes use in a year.
Pelican Solar Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 71st largest, about 0.5% of the state's 14 GW of solar capacity.
St. Lucie County has 14 power plants of 1 MW or more with 3.5 GW in all; Pelican Solar Center is 2% of that and the 3rd largest of 12 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in St. Lucie County goes 2.7 hours a year without power, the 62nd most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pelican Solar Center (outlined) and other plants in St. Lucie County, shaded. 27.522, -80.547.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- St. Lucie County, FL
- EIA plant ID
- 62924
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2021 | – |
Questions
Pelican Solar Center, answered
How much power does Pelican Solar Center produce?
Pelican Solar Center has 75 MW of capacity from one generator. In 2025 it generated 151 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pelican Solar Center power?
Its 2025 output of 151 GWh equals the yearly electricity use of about 11,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pelican Solar Center?
Pelican Solar Center is in St. Lucie County, Florida, at about 27.522°, -80.547°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in St. Lucie County goes 2.7 hours a year without power, the 62nd most of 67 counties in Florida. The county's page has the full outage record.
Who operates Pelican Solar Center?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Pelican Solar Center open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.