Solar power plant · St. Lucie, FL
Pink Trial Solar Energy Center
Pink Trial Solar Energy Center is a 75 MW solar power plant in St. Lucie County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2023. In 2025 it generated 147 GWh, about what 11,000 average Florida homes use in a year.
Pink Trial Solar Energy Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 96th largest, about 0.5% of the state's 14 GW of solar capacity.
St. Lucie County has 14 power plants of 1 MW or more with 3.5 GW in all; Pink Trial Solar Energy Center is 2% of that and the 6th largest of 12 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in St. Lucie County goes 2.7 hours a year without power, the 62nd most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pink Trial Solar Energy Center (outlined) and other plants in St. Lucie County, shaded. 27.298, -80.542.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- St. Lucie County, FL
- EIA plant ID
- 65428
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2023 | – |
Questions
Pink Trial Solar Energy Center, answered
How much power does Pink Trial Solar Energy Center produce?
Pink Trial Solar Energy Center has 75 MW of capacity from one generator. In 2025 it generated 147 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pink Trial Solar Energy Center power?
Its 2025 output of 147 GWh equals the yearly electricity use of about 11,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pink Trial Solar Energy Center?
Pink Trial Solar Energy Center is in St. Lucie County, Florida, at about 27.298°, -80.542°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in St. Lucie County goes 2.7 hours a year without power, the 62nd most of 67 counties in Florida. The county's page has the full outage record.
Who operates Pink Trial Solar Energy Center?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Pink Trial Solar Energy Center open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.