Wind power plant · Paulding, OH

Northwest Ohio Wind

Northwest Ohio Wind is a 110 MW wind power plant in Paulding County, Ohio, operated by Northwest Ohio Wind, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 299 GWh, about what 29,000 average Ohio homes use in a year.

Capacity110 MWNameplate, September 2026
Generated299 GWhIn 2025
Capacity factor31%Share of the most it could make, 2025
Generators3Oldest from 2018

Northwest Ohio Wind in context

Among the 23 wind plants in Ohio in the EIA's inventory, it is the 5th largest, about 8.8% of the state's 1.2 GW of wind capacity.

Paulding County has 8 power plants of 1 MW or more with 634 MW in all; Northwest Ohio Wind is 17% of that and the 3rd largest of 7 wind plants there.

Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Paulding County goes 5.0 hours a year without power, the 48th most of 88 counties in Ohio. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020182019202020212022202320242025GWh 299
01002003004002019202120232025299

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Northwest Ohio Wind (outlined) and other plants in Paulding County, shaded. 41.017, -84.594.

Plant facts

Operator
Northwest Ohio Wind, LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Paulding County, OH
EIA plant ID
59296
  • Wind105 MW96%
  • Solar4.0 MW3.6%
  • Storage0.8 MW0.7%
Where Ohio's power comes from → Ohio power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
NWOH1 Onshore Wind Turbine 105 MW 2018 –
NWO-S Solar Photovoltaic 4.0 MW 2021 –
NWO-B Batteries 0.8 MW · 3 MWh 2021 –

Nearby

Other plants in Paulding County

Questions

Northwest Ohio Wind, answered

How much power does Northwest Ohio Wind produce?

Northwest Ohio Wind has 110 MW of capacity from 3 generators. In 2025 it generated 299 GWh, 31% of the most it could have made running flat out all year (its capacity factor).

How many homes does Northwest Ohio Wind power?

Its 2025 output of 299 GWh equals the yearly electricity use of about 29,000 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Northwest Ohio Wind?

Northwest Ohio Wind is in Paulding County, Ohio, at about 41.017°, -84.594°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Paulding County goes 5.0 hours a year without power, the 48th most of 88 counties in Ohio. The county's page has the full outage record.

Who operates Northwest Ohio Wind?

It is operated by Northwest Ohio Wind, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Northwest Ohio Wind open?

Its oldest generator still running came online in 2018.