Solar power plant · Paulding, OH
Timber Road Solar Park
Timber Road Solar Park is a 50 MW solar power plant in Paulding County, Ohio, operated by Timber Road Solar Park. Its oldest generator still running came online in 2023. In 2025 it generated 100 GWh, about what 9,500 average Ohio homes use in a year.
Timber Road Solar Park in context
Among the 77 solar plants in Ohio in the EIA's inventory, it is the 28th largest, about 1.0% of the state's 5.0 GW of solar capacity.
Paulding County has 8 power plants of 1 MW or more with 634 MW in all; Timber Road Solar Park is 8% of that.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Paulding County goes 5.0 hours a year without power, the 48th most of 88 counties in Ohio. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Timber Road Solar Park (outlined) and other plants in Paulding County, shaded. 41.092, -84.726.
Plant facts
- Operator
- Timber Road Solar Park
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Paulding County, OH
- EIA plant ID
- 66250
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN01 | Solar Photovoltaic | 50 MW | 2023 | – |
Nearby
Other plants in Paulding County
Questions
Timber Road Solar Park, answered
How much power does Timber Road Solar Park produce?
Timber Road Solar Park has 50 MW of capacity from one generator. In 2025 it generated 100 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Timber Road Solar Park power?
Its 2025 output of 100 GWh equals the yearly electricity use of about 9,500 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Timber Road Solar Park?
Timber Road Solar Park is in Paulding County, Ohio, at about 41.092°, -84.726°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Paulding County goes 5.0 hours a year without power, the 48th most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Timber Road Solar Park?
It is operated by Timber Road Solar Park (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Timber Road Solar Park open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.