Wind power plant · Paulding, OH
Paulding Wind Farm III
Paulding Wind Farm III is a 101 MW wind power plant in Paulding County, Ohio, operated by Paulding Wind Farm III LLC. Its oldest generator still running came online in 2016. In 2025 it generated 320 GWh, about what 31,000 average Ohio homes use in a year.
Paulding Wind Farm III in context
Among the 23 wind plants in Ohio in the EIA's inventory, it is the 6th largest, about 8.1% of the state's 1.2 GW of wind capacity.
Paulding County has 8 power plants of 1 MW or more with 634 MW in all; Paulding Wind Farm III is 16% of that and the 4th largest of 7 wind plants there.
Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Paulding County goes 5.0 hours a year without power, the 48th most of 88 counties in Ohio. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Paulding Wind Farm III (outlined) and other plants in Paulding County, shaded. 41.121, -84.751.
Plant facts
- Operator
- Paulding Wind Farm III LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Paulding County, OH
- EIA plant ID
- 60470
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 101 MW | 2016 | – |
Nearby
Other plants in Paulding County
Questions
Paulding Wind Farm III, answered
How much power does Paulding Wind Farm III produce?
Paulding Wind Farm III has 101 MW of capacity from one generator. In 2025 it generated 320 GWh, 36% of the most it could have made running flat out all year (its capacity factor).
How many homes does Paulding Wind Farm III power?
Its 2025 output of 320 GWh equals the yearly electricity use of about 31,000 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Paulding Wind Farm III?
Paulding Wind Farm III is in Paulding County, Ohio, at about 41.121°, -84.751°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Paulding County goes 5.0 hours a year without power, the 48th most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Paulding Wind Farm III?
It is operated by Paulding Wind Farm III LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Paulding Wind Farm III open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.