Wind power plant · Paulding, OH
Timber Road IV
Timber Road IV is a 125 MW wind power plant in Paulding County, Ohio, operated by Paulding Wind Farm IV LLC. Its oldest generator still running came online in 2020. In 2025 it generated 395 GWh, about what 38,000 average Ohio homes use in a year.
Timber Road IV in context
Among the 23 wind plants in Ohio in the EIA's inventory, it is the 4th largest, about 10% of the state's 1.2 GW of wind capacity.
Paulding County has 8 power plants of 1 MW or more with 634 MW in all; Timber Road IV is 20% of that and the 2nd largest of 7 wind plants there.
Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Paulding County goes 5.0 hours a year without power, the 48th most of 88 counties in Ohio. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Timber Road IV (outlined) and other plants in Paulding County, shaded. 41.121, -84.751.
Plant facts
- Operator
- Paulding Wind Farm IV LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Paulding County, OH
- EIA plant ID
- 62944
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TRIV | Onshore Wind Turbine | 125 MW | 2020 | – |
Nearby
Other plants in Paulding County
Questions
Timber Road IV, answered
How much power does Timber Road IV produce?
Timber Road IV has 125 MW of capacity from one generator. In 2025 it generated 395 GWh, 36% of the most it could have made running flat out all year (its capacity factor).
How many homes does Timber Road IV power?
Its 2025 output of 395 GWh equals the yearly electricity use of about 38,000 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Timber Road IV?
Timber Road IV is in Paulding County, Ohio, at about 41.121°, -84.751°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Paulding County goes 5.0 hours a year without power, the 48th most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Timber Road IV?
It is operated by Paulding Wind Farm IV LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Timber Road IV open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.