Wind power plant · Paulding, OH
Paulding Wind Farm II
Paulding Wind Farm II is a 99 MW wind power plant in Paulding County, Ohio, operated by Paulding Wind Farm II LLC. Its oldest generator still running came online in 2011. In 2025 it generated 318 GWh, about what 30,000 average Ohio homes use in a year.
Paulding Wind Farm II in context
Among the 23 wind plants in Ohio in the EIA's inventory, it is the 7th largest, about 8.0% of the state's 1.2 GW of wind capacity.
Paulding County has 8 power plants of 1 MW or more with 634 MW in all; Paulding Wind Farm II is 16% of that and the 5th largest of 7 wind plants there.
Its capacity factor of 37% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Paulding County goes 5.0 hours a year without power, the 48th most of 88 counties in Ohio. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Paulding Wind Farm II (outlined) and other plants in Paulding County, shaded. 41.025, -84.779.
Plant facts
- Operator
- Paulding Wind Farm II LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Paulding County, OH
- EIA plant ID
- 57620
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 99 MW | 2011 | – |
Nearby
Other plants in Paulding County
Questions
Paulding Wind Farm II, answered
How much power does Paulding Wind Farm II produce?
Paulding Wind Farm II has 99 MW of capacity from one generator. In 2025 it generated 318 GWh, 37% of the most it could have made running flat out all year (its capacity factor).
How many homes does Paulding Wind Farm II power?
Its 2025 output of 318 GWh equals the yearly electricity use of about 30,000 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Paulding Wind Farm II?
Paulding Wind Farm II is in Paulding County, Ohio, at about 41.025°, -84.779°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Paulding County goes 5.0 hours a year without power, the 48th most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Paulding Wind Farm II?
It is operated by Paulding Wind Farm II LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Paulding Wind Farm II open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.