Wind power plant · Converse, WY

Pioneer Wind Park, LLC

Pioneer Wind Park, LLC is a 80 MW wind power plant in Converse County, Wyoming, operated by AES Distributed Energy. Its oldest generator still running came online in 2016. In 2025 it generated 253 GWh, about what 25,000 average Wyoming homes use in a year.

Capacity80 MWNameplate, September 2026
Generated253 GWhIn 2025
Capacity factor36%Share of the most it could make, 2025
Generators1Oldest from 2016

Pioneer Wind Park, LLC in context

Among the 28 wind plants in Wyoming in the EIA's inventory, it is the 22nd largest, about 1.7% of the state's 4.7 GW of wind capacity.

Converse County has 10 power plants of 1 MW or more with 2.4 GW in all; Pioneer Wind Park, LLC is 3% of that and the 9th largest of 9 wind plants there.

Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Converse County goes 7.5 hours a year without power, the 2nd most of 20 counties in Wyoming. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020182019202020212022202320242025GWh 253
01002003004002019202120232025253

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Pioneer Wind Park, LLC (outlined) and other plants in Converse County, shaded. 42.728, -105.867.

Plant facts

Operator
AES Distributed Energy
Sector
IPP Non-CHP
Grid operator
PACE
County
Converse County, WY
EIA plant ID
60259
Where Wyoming's power comes from → Wyoming power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PWP1 Onshore Wind Turbine 80 MW 2016 –

Questions

Pioneer Wind Park, LLC, answered

How much power does Pioneer Wind Park, LLC produce?

Pioneer Wind Park, LLC has 80 MW of capacity from one generator. In 2025 it generated 253 GWh, 36% of the most it could have made running flat out all year (its capacity factor).

How many homes does Pioneer Wind Park, LLC power?

Its 2025 output of 253 GWh equals the yearly electricity use of about 25,000 average Wyoming homes (835 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Pioneer Wind Park, LLC?

Pioneer Wind Park, LLC is in Converse County, Wyoming, at about 42.728°, -105.867°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Converse County goes 7.5 hours a year without power, the 2nd most of 20 counties in Wyoming. The county's page has the full outage record.

Who operates Pioneer Wind Park, LLC?

It is operated by AES Distributed Energy (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.

When did Pioneer Wind Park, LLC open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Wyoming home's 835 kWh a month in 2025. Methodology.