Bypass BESS is a 200 MW storage power plant in Fort Bend County, Texas, operated by Bypass BESS LLC. Its oldest generator still running came online in 2026.

Capacity200 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Bypass BESS in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 26th largest, about 1.2% of the state's 16 GW of storage capacity.

Fort Bend County has 25 power plants of 1 MW or more with 7.4 GW in all; Bypass BESS is 3% of that and the 2nd largest of 5 storage plants there.

The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Bypass BESS (outlined) and other plants in Fort Bend County, shaded. 29.484, -95.622.

Plant facts

Operator
Bypass BESS LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Fort Bend County, TX
EIA plant ID
67761
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Batteries 200 MW · 400 MWh 2026 –

Questions

Bypass BESS, answered

How much can Bypass BESS store and deliver?

Bypass BESS can deliver up to 200 MW and hold 400 MWh of energy, from one battery or storage system.

Where is Bypass BESS?

Bypass BESS is in Fort Bend County, Texas, at about 29.484°, -95.622°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Bypass BESS?

It is operated by Bypass BESS LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Bypass BESS open?

Its oldest generator still running came online in 2026.