Solar power plant · Fort Bend, TX

Cutlass Solar II

Cutlass Solar II is a 203 MW solar power plant in Fort Bend County, Texas, operated by Cutlass II Solar LLC. Its oldest generator still running came online in 2024. In 2025 it generated 418 GWh, about what 31,000 average Texas homes use in a year.

Capacity203 MWNameplate, September 2026
Generated418 GWhIn 2025
Capacity factor24%Share of the most it could make, 2025
Generators1Oldest from 2024

Cutlass Solar II in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 74th largest, about 0.5% of the state's 37 GW of solar capacity.

Fort Bend County has 25 power plants of 1 MW or more with 7.4 GW in all; Cutlass Solar II is 3% of that and the 4th largest of 6 solar plants there.

Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020242025GWh 418
010020030040050020242025418

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Cutlass Solar II (outlined) and other plants in Fort Bend County, shaded. 29.390, -95.780.

Plant facts

Operator
Cutlass II Solar LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Fort Bend County, TX
EIA plant ID
66262
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SAREN Solar Photovoltaic 203 MW 2024 –

Questions

Cutlass Solar II, answered

How much power does Cutlass Solar II produce?

Cutlass Solar II has 203 MW of capacity from one generator. In 2025 it generated 418 GWh, 24% of the most it could have made running flat out all year (its capacity factor).

How many homes does Cutlass Solar II power?

Its 2025 output of 418 GWh equals the yearly electricity use of about 31,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Cutlass Solar II?

Cutlass Solar II is in Fort Bend County, Texas, at about 29.390°, -95.780°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Cutlass Solar II?

It is operated by Cutlass II Solar LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Cutlass Solar II open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.