Solar power plant · Fort Bend, TX
Fighting Jays Solar Project
Fighting Jays Solar Project is a 228 MW solar power plant in Fort Bend County, Texas, operated by AP Solar 2, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 454 GWh, about what 34,000 average Texas homes use in a year.
Fighting Jays Solar Project in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 65th largest, about 0.6% of the state's 37 GW of solar capacity.
Fort Bend County has 25 power plants of 1 MW or more with 7.4 GW in all; Fighting Jays Solar Project is 3% of that and the 3rd largest of 6 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Fighting Jays Solar Project (outlined) and other plants in Fort Bend County, shaded. 29.358, -95.746.
Plant facts
- Operator
- AP Solar 2, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Fort Bend County, TX
- EIA plant ID
- 62945
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| FJSOL | Solar Photovoltaic | 228 MW | 2022 | – |
Questions
Fighting Jays Solar Project, answered
How much power does Fighting Jays Solar Project produce?
Fighting Jays Solar Project has 228 MW of capacity from one generator. In 2025 it generated 454 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Fighting Jays Solar Project power?
Its 2025 output of 454 GWh equals the yearly electricity use of about 34,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Fighting Jays Solar Project?
Fighting Jays Solar Project is in Fort Bend County, Texas, at about 29.358°, -95.746°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Fighting Jays Solar Project?
It is operated by AP Solar 2, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Fighting Jays Solar Project open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.