Storage power plant · Fort Bend, TX

Crowned Heron 1 - Storage, LLC

Crowned Heron 1 - Storage, LLC is a 150 MW storage power plant in Fort Bend County, Texas, operated by RWE Americas, LLC. Its oldest generator still running came online in 2026.

Capacity150 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Crowned Heron 1 - Storage, LLC in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 46th largest, about 0.9% of the state's 16 GW of storage capacity.

Fort Bend County has 25 power plants of 1 MW or more with 7.4 GW in all; Crowned Heron 1 - Storage, LLC is 2% of that and the 3rd largest of 5 storage plants there.

The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Crowned Heron 1 - Storage, LLC (outlined) and other plants in Fort Bend County, shaded. 29.482, -95.619.

Plant facts

Operator
RWE Americas, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Fort Bend County, TX
EIA plant ID
68499
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CWHBA Batteries 150 MW · 300 MWh 2026 –

Questions

Crowned Heron 1 - Storage, LLC, answered

How much can Crowned Heron 1 - Storage, LLC store and deliver?

Crowned Heron 1 - Storage, LLC can deliver up to 150 MW and hold 300 MWh of energy, from one battery or storage system.

Where is Crowned Heron 1 - Storage, LLC?

Crowned Heron 1 - Storage, LLC is in Fort Bend County, Texas, at about 29.482°, -95.619°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Crowned Heron 1 - Storage, LLC?

It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Crowned Heron 1 - Storage, LLC open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.