Storage power plant · Fort Bend, TX
Crowned Heron 2 - Storage, LLC
Crowned Heron 2 - Storage, LLC is a 150 MW storage power plant in Fort Bend County, Texas, operated by RWE Americas, LLC. Its oldest generator still running came online in 2026.
Crowned Heron 2 - Storage, LLC in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 47th largest, about 0.9% of the state's 16 GW of storage capacity.
Fort Bend County has 25 power plants of 1 MW or more with 7.4 GW in all; Crowned Heron 2 - Storage, LLC is 2% of that and the 4th largest of 5 storage plants there.
The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Crowned Heron 2 - Storage, LLC (outlined) and other plants in Fort Bend County, shaded. 29.483, -95.620.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Fort Bend County, TX
- EIA plant ID
- 68500
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CWH2 | Batteries | 150 MW · 300 MWh | 2026 | – |
Questions
Crowned Heron 2 - Storage, LLC, answered
How much can Crowned Heron 2 - Storage, LLC store and deliver?
Crowned Heron 2 - Storage, LLC can deliver up to 150 MW and hold 300 MWh of energy, from one battery or storage system.
Where is Crowned Heron 2 - Storage, LLC?
Crowned Heron 2 - Storage, LLC is in Fort Bend County, Texas, at about 29.483°, -95.620°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Crowned Heron 2 - Storage, LLC?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Crowned Heron 2 - Storage, LLC open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.