Solar power plant · Fort Bend, TX
Cutlass Solar 1 LLC
Cutlass Solar 1 LLC is a 111 MW solar power plant in Fort Bend County, Texas, operated by Cutlass Solar 1, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 169 GWh, about what 13,000 average Texas homes use in a year.
Cutlass Solar 1 LLC in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 134th largest, about 0.3% of the state's 37 GW of solar capacity.
Fort Bend County has 25 power plants of 1 MW or more with 7.4 GW in all; Cutlass Solar 1 LLC is 2% of that and the 5th largest of 6 solar plants there.
Its capacity factor of 17% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cutlass Solar 1 LLC (outlined) and other plants in Fort Bend County, shaded. 29.410, -95.734.
Plant facts
- Operator
- Cutlass Solar 1, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Fort Bend County, TX
- EIA plant ID
- 66310
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CT1PV | Solar Photovoltaic | 111 MW | 2022 | – |
Questions
Cutlass Solar 1 LLC, answered
How much power does Cutlass Solar 1 LLC produce?
Cutlass Solar 1 LLC has 111 MW of capacity from one generator. In 2025 it generated 169 GWh, 17% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cutlass Solar 1 LLC power?
Its 2025 output of 169 GWh equals the yearly electricity use of about 13,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cutlass Solar 1 LLC?
Cutlass Solar 1 LLC is in Fort Bend County, Texas, at about 29.410°, -95.734°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Cutlass Solar 1 LLC?
It is operated by Cutlass Solar 1, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Cutlass Solar 1 LLC open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.