Natural gas power plant · Fort Bend, TX

FTBLID2

FTBLID2 is a 11 MW natural gas power plant in Fort Bend County, Texas, operated by Generate ER-NG, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 0.9 GWh, about what 68 average Texas homes use in a year.

Capacity11 MWNameplate, September 2026
Generated0.9 GWhIn 2025
Capacity factor1%Share of the most it could make, 2025
Generators28Oldest from 2021

FTBLID2 in context

Among the 309 natural gas plants in Texas in the EIA's inventory, it is the 165th largest, about 0.0% of the state's 83 GW of natural gas capacity.

Fort Bend County has 25 power plants of 1 MW or more with 7.4 GW in all; FTBLID2 is 0% of that and the 4th largest of 11 natural gas plants there.

Its capacity factor of 1% in 2025 is lower than the 23% typical for natural gas plants across the US.

The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

011222022202320242025GWh 1
0112220222023202420251

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

FTBLID2 (outlined) and other plants in Fort Bend County, shaded. 29.575, -95.637.

Plant facts

Operator
Generate ER-NG, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Fort Bend County, TX
EIA plant ID
66595
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
FLD10 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD11 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD12 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD13 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD14 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD15 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD16 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD17 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD18 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD19 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD20 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD21 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD22 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD23 Natural Gas Internal Combustion Engine 0.4 MW 2021 –
FLD24 Natural Gas Internal Combustion Engine 0.4 MW 2021 –

Questions

FTBLID2, answered

How much power does FTBLID2 produce?

FTBLID2 has 11 MW of capacity from 28 generators. In 2025 it generated 0.9 GWh, 1% of the most it could have made running flat out all year (its capacity factor).

How many homes does FTBLID2 power?

Its 2025 output of 0.9 GWh equals the yearly electricity use of about 68 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is FTBLID2?

FTBLID2 is in Fort Bend County, Texas, at about 29.575°, -95.637°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Fort Bend County goes 5.5 hours a year without power, the 190th most of 240 counties in Texas. The county's page has the full outage record.

Who operates FTBLID2?

It is operated by Generate ER-NG, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did FTBLID2 open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.