Solar power plant · Manatee, FL
Long Creek
Long Creek is a 75 MW solar power plant in Manatee County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2025. In 2025 it generated 179 GWh, about what 14,000 average Florida homes use in a year.
Long Creek in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 125th largest, about 0.5% of the state's 14 GW of solar capacity.
Manatee County has 12 power plants of 1 MW or more with 4.2 GW in all; Long Creek is 2% of that and the 8th largest of 9 solar plants there.
The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Long Creek (outlined) and other plants in Manatee County, shaded. 27.412, -82.104.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Manatee County, FL
- EIA plant ID
- 65906
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2025 | – |
Questions
Long Creek, answered
How much power does Long Creek produce?
Long Creek has 75 MW of capacity from one generator. In 2025 it generated 179 GWh.
How many homes does Long Creek power?
Its 2025 output of 179 GWh equals the yearly electricity use of about 14,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Long Creek?
Long Creek is in Manatee County, Florida, at about 27.412°, -82.104°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Long Creek?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Long Creek open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.