Solar power plant · St. Lucie, FL

Sea Grape

Sea Grape is a 75 MW solar power plant in St. Lucie County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2026.

Capacity75 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Sea Grape in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 159th largest, about 0.5% of the state's 14 GW of solar capacity.

St. Lucie County has 14 power plants of 1 MW or more with 3.5 GW in all; Sea Grape is 2% of that and the 11th largest of 12 solar plants there.

The average electricity customer in St. Lucie County goes 2.7 hours a year without power, the 62nd most of 67 counties in Florida. The county's page has the full outage record.

Where it is

Sea Grape (outlined) and other plants in St. Lucie County, shaded. 27.452, -80.564.

Plant facts

Operator
Florida Power & Light Co
Sector
Electric Utility
Grid operator
FPL
County
St. Lucie County, FL
EIA plant ID
68819
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 75 MW 2026 –

Questions

Sea Grape, answered

How much power does Sea Grape produce?

Sea Grape has 75 MW of capacity from one generator. No full year of generation is reported yet.

Where is Sea Grape?

Sea Grape is in St. Lucie County, Florida, at about 27.452°, -80.564°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in St. Lucie County goes 2.7 hours a year without power, the 62nd most of 67 counties in Florida. The county's page has the full outage record.

Who operates Sea Grape?

It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.

When did Sea Grape open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.