Natural gas power plant · Manatee, FL
Tropicana Products Bradenton
Tropicana Products Bradenton is a 47 MW natural gas power plant in Manatee County, Florida, operated by Tropicana Products Inc. Its oldest generator still running came online in 1990. In 2025 it generated 195 GWh, about what 15,000 average Florida homes use in a year.
Tropicana Products Bradenton in context
Among the 68 natural gas plants in Florida in the EIA's inventory, it is the 54th largest, about 0.1% of the state's 56 GW of natural gas capacity.
Manatee County has 12 power plants of 1 MW or more with 4.2 GW in all; Tropicana Products Bradenton is 1% of that and the 2nd largest of 2 natural gas plants there.
Its capacity factor of 48% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Tropicana Products Bradenton (outlined) and other plants in Manatee County, shaded. 27.483, -82.548.
Plant facts
- Operator
- Tropicana Products Inc
- Sector
- Industrial CHP
- Grid operator
- FPL
- County
- Manatee County, FL
- EIA plant ID
- 50971
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Natural Gas Fired Combustion Turbine | 47 MW | 1990 | – |
Questions
Tropicana Products Bradenton, answered
How much power does Tropicana Products Bradenton produce?
Tropicana Products Bradenton has 47 MW of capacity from one generator. In 2025 it generated 195 GWh, 48% of the most it could have made running flat out all year (its capacity factor).
How many homes does Tropicana Products Bradenton power?
Its 2025 output of 195 GWh equals the yearly electricity use of about 15,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Tropicana Products Bradenton?
Tropicana Products Bradenton is in Manatee County, Florida, at about 27.483°, -82.548°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Manatee County goes 14 hours a year without power, the 26th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Tropicana Products Bradenton?
It is operated by Tropicana Products Inc (EIA sector: Industrial CHP), and it feeds Florida Power & Light.
When did Tropicana Products Bradenton open?
Its oldest generator still running came online in 1990.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.